If you read the announcement from below it states that all drillholes are drilled at 55 deg perpendicular to the mineralisation. So with cutting edge mathematicswe get a length of 244.15m.
https://www.asx.com.au/asxpdf/20180201/pdf/43r835v315mm9n.pdf
I'm expecting the JORC to be released on Tuesday as all markets are up and would be a good time to do so. My estimate for the resource is 6500x5x244x2.8=22.2 Mt
Add to My Watchlist
What is My Watchlist?
we get a length of 244.15m.