Few comments on a brief look.
1. I think were looking real optimistic for a 6mt plant from the get go (says the guy that thought a 40mt+ JORC was way too optimistic). Im assuming more like 2 - 3mt. Then maybe looking to do what TAW are doing and building another if/when feasible.
2. Strip ratio for open pit is likely to be 8-9 I think. Obviously underground is relatively close to 1.
3. I assume you have just issued new shares to fund capex?
This is good stuff to be looking to forecast this stuff, thanks.
- Forums
- ASX - By Stock
- CLA
- Mining / Processing Costs
CLA
celsius resources limited.
Add to My Watchlist
0.00%
!
0.7¢
Mining / Processing Costs, page-15
-
Top Stories
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
