Share
49 Posts.
lightbulb Created with Sketch. 2
clock Created with Sketch.
18/04/18
20:05
Share
Originally posted by Chugwun
↑
I have read back through all the ASX drilling updates.
So what information I have been able to deduce is the following:
(1) Three drill rigs are now deployed at Kachi- One diamond and two Rotary
(2) The rotary drill rig at drill hole JV03 has drilled to a depth of 240m( Target was 300m?)
Refer ASX announcement 15th March.
(3) This drill hole has been cased, sampled and is currently undergoing testing?
(4) The results are to be reported "...in the coming weeks". Another push-back into MAY?
Refer ASX announcement 12th April
(5) The second rotary drill rig diamond drill rig are drilling about 11 kms south east of JV03.
Refer photograph
Just a little bit concerned reports are not entirely accurate?
I am only interested any getting some real assay results. Appears we are going into May. Four months on from original estimate for publishing results.
Expand
Note point 5
"(5) The second rotary drill rig diamond drill rig are drilling about 11 kms south east of JV03."
LKE have a lot of ground !!!