2.2. Auger Drilling Program
The auger drilling program being undertaken continued during the Quarter. As at 31 December 2017, 1,863 holes had been completed for 15,788m, at an average depth of 8.5m, including several lines aimed at fully defining the Sabali anomaly.
Samples from 967 of these holes have been analysed by ALS Perth Laboratory and Birimian is awaiting results. The remaining 896 samples have been transported to Perth and are awaiting analysis. The auger rig is continuing to drill additional exploration holes within the Torakoro tenement. This program is expected to be completed in early February 2018.
Where are these results???
3.4. Koting Auger Program
The auger drilling program for Koting (360 holes at 8m for 2,880m) will proceed in February 2018. A contract has been let for a second auger drill rig to carry out this work. This will not impact on the auger drilling program being carried out at Goulamina.
Should we be expecting announcements when drilling such as above starts?
The lack of communication is the reason why we are losing MOMENTUM.
Not whingeing but the marketing and communication seriously needs to pick up.