Hi Galvanise This is two year-old news and in the upcoming TZN-ZFX quarterly (July 31) or soon thereafter we can expect either a JORC or in any case a significant update on the Menninnie project mentioned here. Also Magellan seems to have a new lead mine - anybody heard about this one - it is pty, ltd. Be damned nice to be a director there.
Here is a quote from TZN 26 April 2005 - 18% pb "A recent drill hole on the Menninnie project intersected 8 metres grading 18% lead oxide. Nearby RAB holes intersected up to 5% Pb and Zn. It is expected that this oxide (Cerussite -Pb carbonate) deposit overlies high grade sulphide mineralisation. This extent of the deposit is being defined by 4700 metres of aircore drilling on six lines north and south of the discovery hole. The Magellan Mine (owned by Magellan Metals Pty Ltd) in WA is soon to commence production of lead from similar deposits, however lead is to be refined onsite at a capital cost of at least $25,000,000. Lead oxides from Menninnie could be treated at the Pt Pirie smelter only 160 km to the east, avoiding considerable capital expenditure." Cheers HK (holding TZN)