HX Assembly / testing, page-10

  1. 9,983 Posts.
    lightbulb Created with Sketch.  14
    I don't really see much difference between inside a factory to outdoors... The concept machine was stacking bricks on a concrete floor, same as a concrete slab outside... They have sophisticated 3d technology which maps out the block, so it knows exactly where to place the bricks... Wind is the only factor that I can see which could have some sort of impact but the machine and bricks are heavy so the wind would have to blow a hurricane...My patience is wearing thin atm, not due to the lack of updates, but to potential red flags... Those being a change to the original plan- 2nd HX construction, looking at other potential markets for the machine and long delays from the original timeline...These things could be a storm in a teacup and legitimate due to the complexity of the project, or it could signal hidden problems that they are currently trying to sort out... Either way, I think questions will be answered shortly whether this price is a nice buying opportunity or not... Due to my experience in other stocks in the past, more often than not, a change to the original plan and lengthy delays have resulted in a negative outcome for holders...
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
Last
0.4¢
Change
0.001(16.7%)
Mkt cap ! $20.79M
Open High Low Volume
0.3¢ 0.4¢ 0.3¢ 442.0K

Buyers (Bids)

Vol. Price($)
14166328 0.3¢
 

Sellers (Offers)

Price($) Vol.
0.4¢ 80131319
Last trade - 16.10pm 10/07/2026 (20 minute delay) ?
FBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.