So what are the figures being bandied around?
My very simple calculation, and perhaps optimistic, is as follows;
5km long X 3m thick X 200m deep = 3Mm3 X 2.5SG (Guess) = 7.5Mt
7.5Mt X 0.15% (0.0015) = 11,250t Co
Not wanting to rain on the parade, just temper expectations - and having worked on a similar lead/zinc/silver deposit in Namibia I am very aware of how expectations can get ahead of reality.
So what are the figures being bandied around? My very simple...
Add to My Watchlist
What is My Watchlist?
