CAPEX and OPEX are breifly discussed in capital raising doc from BGF equities research 29/07/08.
In short, Sandpiper is considered to be much less costly to develop and run than MAK project, which put forward estimate CAPEX~100M$ and OPEX~100$/T.
Reasons stated are less infrastructure cost and no crushing required.