Just looking at Orbite's capex you'd realise that the first ATC Capex is not right. Therefore I've always considered it being proportional with the output of the plant(orbite 1100 tpa,capex 128 mcad-altech 4000 tpa. capex400maud). Now if Altech Capex is blown up i doubt it.
Even so being insured against failure makes it more valuable. But if Fyi or Heg or whoever actually does it at 1/4 of Altech's price it will be a good investment but it has to be proved. At the moment altech is one step away from production,Orbite is stuck with its own issues,the rest are just wannabees.
Just looking at Orbite's capex you'd realise that the first ATC...
Add to My Watchlist
What is My Watchlist?
