Good news. They have finally committed to pushing on with Kempfield. A month for design and permitting, 1 to 2 months drilling , 1 to 2 months for processing, logging and assays. Because the grades are low they are right to make sure the metallurgy works. A significant step forward.
Good news. They have finally committed to pushing on with...
Add to My Watchlist
What is My Watchlist?
