If they can keep the mill pumping at 950,000 tonnes/annum @ 3.6 g/t we’re looking at a little over 100,000 oz. The bottle necks are bing removed, and it seems like an ongoing process, so the through put can only improve. In the earlier slide shows they stated that the mill can be converted to over 1 mil tonnes/annum with minimal cost. Having said that they will have to get the AISC down substantially. They state this will come down to be in 1500’s next Q and even less after that. Let’s hope so.
Add to My Watchlist
What is My Watchlist?
