Mate.. It would need to be disassembled..
If you have seen any of the pictures, the Original PPP is 2 storeys tall build around a gantry.
It would be bolted to the ground and with the added on parts I assume it would take a few trucks to transport it to WA.. then a few weeks to reassemble and commission.
Ann: Pre-Pilot Plant Milestone and Technical Strategy Update, page-65
Add to My Watchlist
What is My Watchlist?
