They state that the design of the 2nd generation reactor has been finalised. This surely implies that only fine tuning is required performance wise, if at all. Surely tbey couldn't claim the design is finalised if it is only converting a small proportion of the Methane to hydrogen and/or graphite ?
They state that the design of the 2nd generation reactor has...
Add to My Watchlist
What is My Watchlist?
