BRU buru energy limited

Ann: Operations Update, page-20

  1. 496 Posts.
    lightbulb Created with Sketch.  39
    Have to get the pump there .ESP not the right pump .Diesel powered low pressure high volume irrigation pump better but still need lower area to pump to and a right sized pipe to get there .
    Imo a tracked excavator would be the most practical solution .Dig a drain to a lower area .If no culvert in this low part of the track , need to dig a trench through the track as well for both sides to drain .Would not need a big machine 10 tonner with a trenching bucket would be big enough and a smaller machine could probably be able to get closer to the inundated section before it needed to walk in .
    Might need to bring in diesel by helicopter if it was any distance to a lower area and or the excavator had a long walk to the job .
    If there is any sort of natural drainage line job might only take a day or two once the machine was on site .Just depends on the lay of the land .
    gltah
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
Last
1.2¢
Change
0.000(0.00%)
Mkt cap ! $13.85M
Open High Low Volume
1.3¢ 1.3¢ 1.2¢ 153.7K

Buyers (Bids)

Vol. Price($)
1400228 1.1¢
 

Sellers (Offers)

Price($) Vol.
1.2¢ 336024
Last trade - 10.15am 30/07/2026 (20 minute delay) ?
BRU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.