Share
13,803 Posts.
lightbulb Created with Sketch. 196
clock Created with Sketch.
24/04/18
10:46
Share
Originally posted by spendthrift
↑
Just like the tortoise. Go you good thing!
Haven't seen a good pilot plant movie in a while, so keen on the next episode. From the photos the acid bake pilot plant has got to be the biggest kit ARU has used to date, although the size of the phase 3 bulk pre leach looked pretty impressive.
I've gone back to try and work out how much NdPr ARU will have recovered at the end of the phase 4 pilot. Had to make a few assumptions, but I put it at about 107 kg from the initial 14 tonnes of ore feed into the bene pilot. Worth about US$6k at current prices, if you could turn all of it into NdPr oxide. I hope it pays for the movie LOL!!
Expand
Lol, more torture than tortoise, 107kg in 10 yrs?
https://hotcopper.com.au/threads/ann-md-presentation-at-agm.787069/#.Wt58Wy5uZhE
For perspective Lynas will be producing 20,000kg NdPr daily from Jan '19, proven.