To make it a little more simple
RE the testing
If you were emptying your swimming pool with a pump . Would you stick a hose in it at the same time ?
Because that is effectively what the rain is doing
As for the depth of trenches
6 meters means more resource
So if you could dig past 4 meters why wouldn’t you ??
And a cut of grade is essential
Because ponds plant etc is going to be sized
To the grade
Eg a resource that is 10000 mg will require
Half the pond size of a resource of 5000 mg
A 2000 mg brine being pumped in will
Require
2.5 times as long evaporation as a 5000 brine
Meaning pond neads to be 2.5 times bigger
To achieve the same evap time
It also alters the mass balance
Salt ratios etc
- Forums
- ASX - By Stock
- AMN
- Ann: Mackay SOP Project Fieldwork Update
AMN
agrimin limited
Add to My Watchlist
0.00%
!
5.6¢
Ann: Mackay SOP Project Fieldwork Update, page-11
-
Top Stories
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
