The revised drill and frac plan shows 7 fracs as against the previously planned 8. So roughly only a 20% reduction (if all else is equal). It is probably an option to also extend the horizontal an extra distance pass the vertical to get the 8th frac, if drilling through the siltstone goes well (fingers crossed).
A question for the more knowledgeable, given the siltsone is only 15 m thick, would it be possible to frac both the Vu upper and lower from the same horizontal? Perhaps a longer term solution that would likely also help with the overall economics.