Share
4,224 Posts.
lightbulb Created with Sketch. 56
clock Created with Sketch.
09/04/18
11:14
Share
Originally posted by ash007
↑
Another big news. They building/certifying their own "bricks". I wonder if brickworks has anything to do with this? Also, looks like Build1 slabs are already poured in preparation. Anyone in WA could see if special slabs are being prepared near the 1st house from archistruct?
FBR has also designed and produced an optimised block for use by the Hadrian X, which is equivalent in size to approximately 11 standard house bricks and weighs less than 20kg. This block has been designed to optimise the performance of the Hadrian X, to reduce waste and for use with FBR’s construction adhesive which is used in the Fastbrick Wall System rather than traditional mortar. Formal testing and certification of Hadrian optimised blocks is well underway and returning very positive results. The Fastbrick Wall System is also presently undergoing testing in preparation for Build1.
PS: If these don't move the SP up, I don't know what will.
Expand
No mention of Archistruct and the 11 house MOU
Looks like they will do the first one on their own
No mention of any collaborative R N D with CAT USA either
Interesting about the waste management tho Cleanaway who bought out tox free are miles ahead in that space with robotics
Unless it's an add on companies can use nice to see diversification of DST -really like to see them trial it in Ageiculture
Given the timeline FBR are at least another 2-3 years away from profitability in my view
In that time they will burn cash big time
A very positive update but not a lot of surprises and the timeline to build just one house could be problematic
Now it's down to CAT I'm going to wait to I see a binding commitment from CAT to add any more
I just don't see any rush here as the time line drags on so will the SP
Everything looks to be going to plan just need CAT signed without CAT this will take forever to get mass scale globally now