Very complex, if the brick breaks up in the cutting / trimming process, where does it get to ejected out of the system? If the monster bricks fell out of the grip in the vending belt within the retractable boom arm, how do HX operator get it out of the system, manually through the holes on the side I assume.
You would assume at least 1 in 1000 or 10,000 bricks handled within the system may jam at some error rate, and how to handle this error operationally is going to be big challenge, it's easier to assume automation make things perfect, but very likely it never is.
The next biggest de-risk point is DST testing after assembly, without DST working, this is all back to scratch board.