Ann: Fastbrick Robotics Hadrian X Update, page-176

  1. 812 Posts.
    lightbulb Created with Sketch.  35
    Mobile cranes do not have
    1. depalletizing robotic machinery
    2. machinery for cutting and shaping bricks.
    3. a conveyor belt system to transport 20 Kg blocks across the boom at the rate of 50 blocks per hour or almost a 20 Kg block per minute [ the rate is my estimate, no data to support this ]

    All that plus more items require a lot of energy to run continuously.
    It will not be trivial to get this side of the project right.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.