1. This seem contradict with a common sense:
brine production of Li is the lowest cost, spodumene lower, Mica the highest.
2. the capex is a bit too high ~US$250M
3. Too SLOW, targeting at production after 2020.
Add to My Watchlist
What is My Watchlist?
