"Construction of the project is complete apart from the final...

  1. 10,108 Posts.
    lightbulb Created with Sketch.  30
    "Construction of the project is complete apart from the final cabling and grid connection expected in coming months, to be followed by the delivery of power to the Australian Department of Defence under a long term power supply agreement."

    I am wondering why the cabling and grid connection is only being done now?

    I would think this could have been done at the same time as the array was being built.
 