Actually, the IRR for AVB projects are higher than Carrapeteena. I believe PB is around 34% using a long term copper price of 2.94 . Carrapeteena is around ~20% IRR at copper 2.92.
The sensible thing for OZL to do post takeover is to max out capacity at Antas North and maybe even expand there.
Add to My Watchlist
What is My Watchlist?
