Without assuming a mix of OEM is acceptable then it’s pretty much guaranteed EMC will be awarded a certain number of the 60
Or if in fact WP are wanting a single OEM across all 60 sites then EMC have the edge considering the success of the trials already completed. If I was WP and wanted to install Bulk sites then I would lean towards a Company with a proven successful history?
I’m sure there are other Company’s that have the same proven record however none that I know of with WP.
Does anyone want to have a guess at cost of 1 site, a Generator, Solar Panels and Batteries. I reckon about 50k (very wild guess) installed x 60 so maybe another 3 million dollar contract coming our way![]()