If they don't already have a diesel generator, you would have to add the cost of that as well.
With the falling cost of solar pv and batteries, I was thinking way lower than $100k.
They may need more capacity when they get electric combine harvesters happening.![]()
If they don't already have a diesel generator, you would have to...
Add to My Watchlist
What is My Watchlist?
