Molycorp Project Phoenix used a new technology multi stage cracking facility that was able to process both the bastnesite and monazite present within Mt Pass ore body although not sure if it was actually successful. The old processing facility was on!y able to process the bastnesite ore using a roast-hydrochloric acid leach process, the monazite went to tailings.
For monazite present in the Mt Weld ore body, LAMP cracking & leaching facility uses a sulfuric acid bake process which would not be suitable for bastnesite.
Two very different processes extracting RE from monazite ore and bastnesite ore.
- Forums
- ASX - By Stock
- LYC
- Shenghe AR
LYC
lynas rare earths limited
Add to My Watchlist
2.12%
!
$14.79
Shenghe AR, page-14
-
Top Stories
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
