CCE 2.56% 3.8¢ carnegie clean energy limited

State of Play, page-5

  1. 10,108 Posts.
    lightbulb Created with Sketch. 30
    Go Ashkan, bring this baby home.

    Ashkan Rafiee


    Hydrodynamics Engineer at Carnegie Wave Energy, Analysis Engineer Contractor


    • Senior Hydrodynamics Engineer
      Company NameCarnegie Clean Energy
      Dates EmployedJul 2015 – Present


      Employment Duration2 yrs 10 mos
      LocationPerth, Australia

      − Managing the hydrodynamics activities during concept design, FEED and detailed design stages.
      − Work Package Manager on Unit Scale Optimisation of C6M device
      − Incorporated DNV standards in the design process of CETO device
      − Finite Element Analysis (FEA) of CETO device using SolidWorks and Calculix softwares
      − Fatigue analysis of various CETO components
      − Analysis and design of mooring and umbilical system for CETO device using OrcaFlex
      − Hydrodynamics CFD modeling using OpenFoam, WAMIT and NEMOH
      − Exported hydrodynamics CFD results to hydraulic design tools
      − Developed the idea and performed detailed theoretical and numerical analysis of Multi–Moored CETO device that significantly increase the absorbed power through coupling modes of motion
      − Implemented a novel approach for analysis of design wave groups to efficiently and accurately estimate extreme loads and response of CETO 6
      − Created a collaboration with Viking SeaTech on mooring design and analysis
      − Created and managed strong collaboration with University of Western Australia,
      Centre for Offshore Foundation Systems (CoFS), University of Adelaide and Australian Maritime College (AMC)
      − Designed and performed wave tank testing during the detailed design stage of CETO 6
 
watchlist Created with Sketch. Add CCE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.