Thanks Cryptic. To me it reads that they extend the inferred resource 600m down dip from the deepest drill hole. So in some cases that would have the total resource at 950m down dip but only drilled the top 350m. Seems a bit of a stretch to me to triple the total resource depth without any drilling, given some sections show faulting. Jim. DYOR
Most Undervalued Sulphide Cobalt Compared to ASX Cobalt Peers-Next Cobalt Black Horse, page-21
Add to My Watchlist
What is My Watchlist?
