STX strike energy limited

Ann: Jaws-1 Horizontal Well Update, page-29

  1. 52 Posts.
    lightbulb Created with Sketch.  2
    The revised drill and frac plan shows 7 fracs as against the previously planned 8. So roughly only a 20% reduction (if all else is equal). It is probably an option to also extend the horizontal an extra distance pass the vertical to get the 8th frac, if drilling through the siltstone goes well (fingers crossed).

    A question for the more knowledgeable, given the siltsone is only 15 m thick, would it be possible to frac both the Vu upper and lower from the same horizontal? Perhaps a longer term solution that would likely also help with the overall economics.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
Last
10.0¢
Change
-0.005(4.76%)
Mkt cap ! $377.9M
Open High Low Volume
10.5¢ 10.5¢ 9.9¢ 7.280M

Buyers (Bids)

Vol. Price($)
1122547 10.0¢
 

Sellers (Offers)

Price($) Vol.
10.5¢ 2708977
Last trade - 16.10pm 10/07/2026 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.