Q1 results.
3×15000=45000 tonnes
$860 (2017 pricing) ×10%= $946 (2018) minimum. Cost $325/ t
45000× 600 ( 946-325)= $27 000 000. (Close enough)
Annual 200000×600= $120 000 000 per year.
Sdv modular construction begin at $100mil
2nd half with or without a partner. $200mil profit per year.
Mtc+sdv =$300mil/ year. Implying p/e 10 gxy $3bil or $9 per share in two years or $6 in one year. As forcasted $5-$6 12 nonths.
SHORTERS"YAWWNNN" do your best.
Add to My Watchlist
What is My Watchlist?
