below is an example of 'theoreticalism'
AMN = grade of 8.25 vs RWD grade of 11.35
AMN scoping study said: "steady-state brine extraction of 66.5 gigalitres (“GL”) per year over a 20 year life... for a production target of 370,000 tonnes per annum (“tpa”) of SOP"
RWD scoping study said: "60-70 million cubic metres of brine delivered to the system each year...the production of 400,000 tonnes per annum of SOP"
now both desk-top estimates are similar yet the RWD grade is 38% higher
the most recent AMN presentation says: "370,000 tonnes per annum target... trench extraction of 78.5Mtpa of groundwater "
now using the scoping study assumptions with a 67% recovery:
AMN = 66.5GL x 8.25 grade x 67% recovery = 367,579 tonnes
RWD (low case) = 60.0GL x 11.35 grade x 67% recovery = 456,270 tonnes
RWD (high case) = 70.0GL x 11.35 grade x 67% recovery = 532,315 tonnes
i think the significant differences here show how theoretical previous assumptions are
the impression is either AMN have over-estimated or RWD have under-estimated
..........
- Forums
- ASX - By Stock
- RWD
- Ann: Pre-Feasibility Study Update
RWD
reward minerals ltd
Add to My Watchlist
0.00%
!
2.9¢
Ann: Pre-Feasibility Study Update, page-28
-
Top Stories
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
